Change Impact Visualizer

Models what a budget, bid or structure change would have done to last period numbers.

What to upload

A campaign-level daily export covering 30+ days (.csv).

How it runs

  1. Download the report from Amazon exactly as named above — default column sets are fine.
  2. Drop it on the page. Parsing happens in your browser, so the file never reaches a server.
  3. Set the thresholds. Every table and figure re-ranks as you change them.